Specifications include, but are not limited to: The project scope will include all items necessary to complete or maintain in-lieu fee mitigation projects except for construction. This will include but is not limited to the following: o Site identification including coordination with stakeholders o Property boundary surveys and descriptions, preparation of plats o Property and easement acquisition research o Easement monitoring and compliance activities o Utility relocation design when related to in-lieu fee projects o Preparation of conceptual design plans o Signage and boundary marking o Topographical surveys o Engineering design and plan preparation including modeling o Data collection o Biological assessments, surveys, monitoring, and reporting o Section 106 coordination with the State Historic Preservation Office o NEPA Coordination o Section 7 Endangered Species Act coordination o All required permits and supporting documents including but not limited to 401 WQC, Floodplain, and KPDES from Kentucky Division of Water, 404 Permits from U.S. Army Corps of Engineers, or local permits o Construction Oversight o Non-construction related remedial or maintenance activities o Post construction monitoring and all related reports, coordination, and meetings o Other non-construction activities that may be required but not listed