Specifications include, but are not limited to: Reclamation plans consist of re-closing the portal with wildlife access and collecting drainage into a Gabion "V" Ditch 100 feet in length which will take the water to the bottom of the slope. The water will then flow into a 35 L.F. section of 10' wide Concrete Block-Tied Mat Ditch. A concrete headwall will channel the water into 125 feet of 15" HDPE Pipe and discharge into Two Mile Creek. Water at the toe of the slope above the back yard will be collected into a length of combination rock ditch-drain, with a portion of this flow directed into the 15" HDPE Pipe, and a portion directed into another 15" HDPE Pipe on the east side of the project site. The waste area will be on site on both sides of this 15"Pipe on the east side. Bituminous repair is included as necessary for the county road.