Specifications include, but are not limited to: Cutting and patching shall be done by craftsmen skilled and experience in the trade or craft that installed or furnished the original work. Repairs shall be equal in quality and appearance to similar adjacent work and shall not be obviously apparent as a patch or repair. Work that cannot be satisfactory repaired shall be removed and replaced. Any existing item that is to remain and is damaged during construction shall be replaced at the Contractor’s expense. The Owner will provide water and electricity for this Project. The Contractor shall provide for all temporary taps, hoses, lines, boxes, lighting and installation of the same for construction operations. Electricity shall not be used for heating purposes. In the event that the Contractor is wasteful with these utilities, the Owner shall charge the Contractor accordingly.