Specifications include, but are not limited to: Furnishing and installing materials for the structured cabling system unless specific provisioning or installation of materials is denoted in this RFP. Promptly repairing all damage to the building due to carelessness of contractor employees and exercising reasonable care to avoid any damage to the building. Reporting to SCPS any damage to the building that may exist or may occur during the contractor’s occupancy of the building. Installing the wire, cable and hardware in accordance with state/federal specifications as well as outlined herein. Conducting tests and inspections as specified post-installation. Promptly correcting all defects for which contractor is responsible as determined by SCPS Coordinating all work with SCPS representative before the commencement of the installation. Maintaining insurance and appropriate warranty bonds on the proposed distribution system until such time as it is accepted by SCPS.