The scope of the project includes the removal of steam and condensate piping in the portion of the utility tunnel from manhole #3 to the mechanical rooms of Kentucky Hall, Chandler Hall, Hill Student Center, and Hathaway Hall. In place of the steam and condensate piping, new chilled water supply and return mains and associated supports will be installed in the same location. Prior to substantial completion, the chilled water plant will be shut down and the new chilled water piping will be connected at the tunnel mains and within the mechanical rooms. Removal of tunnel lids and excavation of direct buried pipe will be required to support this scope. The tunnel lids will be closed by a separate contract. This project will require new direct buried pipe to be regraded to match existing grade and surface.