Specifications include, but are not limited to: • Install of four 4” Schedule 40 conduits. • Conduit path should follow existing communications conduit on opposite side of steam piping. • Path will require crossing steam lines in at least one location. At each location, conduit should be sleeved inside of appropriately sized steel pipe. Contact with steam should be minimized in order to avoid disturbance of steam insulation. • Path will be encased in concrete and top of concrete painted orange. • 10Ga. Tracer wire will be installed in one of the ducts and securely fastened on each end. • 6” orange “Fiber Optic” warning tape will be installed 12 inches above duct bank. • Mule tape pull string to be installed in each conduit and tied at each end. • GIS data to be collected and provided to EKU Facilities dept.