Specifications include, but are not limited to: Drilling: A truck-mounted rotary rig that is capable of drilling inside of 2” pipe. The rig must have the ability and equipment necessary to retrieve a variety of lost pipe in the wellbore (i.e.: 1” left-handed pipe and fishing tools) and be capable of drilling new hole to a minimum depth of 1200’. A pipe-pulling unit (mechanical only, no hydraulic units) with experienced crew that can pull a minimum of 1500’ of 2 3/8” pipe in a reasonable time frame. This unit will also be equipped with tubular working strings (fishing tools) as necessary, and cementing strings used to plug the wells. ; A 70 barrel or greater, vacuum truck to haul fresh water to the well sites and to empty fluids from on-site pits and remove same to authorized Class II disposal facilities. ; Oilfield wireline equipment with operator capable of performing cased-hole perforating services in 2” or larger pipe size, or 2” tubing with enough charge capability to perforate multiple strings of casing. Casing which appears to be cemented at the surface should be perforated in at least two or three intervals, unless well is documented by KCC staff as an Alternate II completion.; A tractor mounted loader/backhoe (50 horsepower or greater) and operator capable of excavating wellheads and constructing circulation pits for the plugging operations. A bladed dozer (D5 or larger) with operator capable to assist in the moving of equipment onto the site and in restoration work. Dozer must be equipped with winch and cable. The site will be leveled to a minimum of four feet of topsoil over cement debris or level with the bedrock.