Specifications include, but are not limited to: a. The contractor shall supply all materials, equipment and labor necessary to provide hauling, delivery, and placement at Flint Hill Trail State Park and Prairie Spirit Trail State Park. The contractor shall work closely with KDWPT staff to insure the proper placement of the material. b. Transport equipment must turn around in designated areas. Transport vehicles become easily mired in the soft sands off established trails and disturbance to established vegetation from tracks/ruts take a very long time heal in the fragile Sandsage Prairie environment. c. Backing up to ½ mile into some project areas may be necessary. d. Rock will be delivered in a standard dump truck which, when fully loaded, can carry 13,000 to 15,000 pounds and can spread the load with a chained swing gate e. Delivery and hauling fees are included in cost. f. If weather conditions allow, contractor is expected to mobilize to job within 48 hours. g. Contractor shall supply equipment and operator. h. There will be no annual guarantee for amount of aggregate ordered.