Specifications include, but are not limited to:Provide all labor, materials, and equipment necessary to perform the security lighting work. Two new branch electric circuits will be brought to two light poles each pole on it’s own circuit from existing fish cleaning station power box using two breakers and installing a photo cell at that location. Photo Cell will be controlling lighting contactor for all lights. Electric line will be THHN #12 copper wire going to the first pole and THNN #10 copper wire going to the second pole. The circuit shall not have more than 3% drop in electric service. Light pole closest to boat ramp will be removed and a new pole with be installed with two 126 watt flood light LED fixtures. One Flood light will be pointing towards boat ramp and the other towards curtsey dock.On the second pole one flood light will be pointed towards parking area. On both poles will have metal conduit installed from underground to the full length of pole to the lights. All wire underground will also be in schedule 40 pvc conduit. Conduit going from main electrical box tofirst pole will be in 1 inch schedule 40 pvc, conduit going to second pole will be ¾ inch schedule 40 pvc conduit.