Specifications include, but are not limited to: All labor, materials, and equipment necessary to provide for the removal and replacement of the scale system located at required location. The Contractor shall furnish and install all of the materials and components to operate the system to meet the requirements for commercial scales as detailed by the latest edition of the NIST (Formerly National Bureau of Standards) Handbook 44. The scale system must be traceable to an active NTEP Certificate of Conformance. The Contractor shall remove one existing truck axle scale, deck, deck concrete, sump pump, and all resulting debris to accommodate the installation of one, new, Linkage load cells double or single ended shear beam, 50 ton minimum, 16’ x 12’ truck axle scale, pit, and reinforced deck, and sump pump, as required to complete the replacement/installation to the satisfaction of all applicable governmental regulatory authorities and the KHP.