Specifications include, but are not limited to: 1. Mobilization/Demobilization 2. Site Clearing and Preparation 3. Care for Water / Control Pollution 4. Installation of Rock Fill to extend and buttress Earth fills to be constructed in existing ponds 5. Non-buttressed Earth Fills to be constructed in existing ponds 6. Provide and Install High Density Polyethylene Culverts with inlet flared sections 7. Earthwork to Create New Roads to Design Lines, Grades and Points 8. Haul and Place Aggregate Materials for New Roads 9. Scarifying Old Roads and Preparing them for Revegetation 10. Liming, Mulching and Revegetation 11. Provide and Install Revegetation Fence and Three New Gates 12. Installation of Reinforced Concrete Shafts for Boardwalk. 13. Installation of Wooden planks for Boardwalk.