Specifications include, but are not limited to: Demolition includes partial removal of the original wooden floor planks and wood sleepers attached to the existing concrete slab. These are to be delivered to owner for storage. Contractor must provide additional blocking as required to stabilize and support the existing original wood floor to remain. Demolition and new construction work include but is not limited to: Demolition: wood floor (as shown on drawings), suspended ceilings, selective mechanical, plumbing, and electrical demolition. Roof core drilling and removal of roof material for new vents, pipe supports and roof equipment. New construction work includes but not limited to: Rough carpentry, solid surface and wood countertop with sink, plastic laminate panel, corner guards, roof patching, sheet metal work, joint sealants, window repair, wood doors.