Specifications include, but are not limited to: 1 Demolish and remove from site to an approved landfill, the residential structures located at 1001 – 1023 Garden Way. The structures shall include but not be limited to the residential buildings, foundations, decks, canopies, porches, steps, concrete pads, patios, above ground and below ground supports, footers, and piers; landscaping and in-ground sprinkler system and backflow preventer; wiring, plumbing, conduit, fixtures, equipment, and personal property. 2 Utility services. The contractor shall work with all the utility companies (gas, electric, phone, water, and sewer) to ensure the abandonment of all utilities to the structure. The existing manholes will be protected by the City Utility Department 3 Remove and dispose of the western 2/3 of the parking lot and concrete edging; prep area for turf establishment. A portion of the existing parking lot is to remain to be used for future park and recreation facility on the site. The concrete approach at the street must remain. 4 Remove the metal chain link fence at the rear of the buildings 6 Restore the site to a natural open space for passive recreational use; This shall include filling all holes and cavities with clean compactable fill material, graded to drain, bringing the area to a flat, finished surface ready for seeding. The top 24” of fill shall be topsoil compacted. Cavities or wholes deeper than 24” must have fill applied in 12” lifts and then compacted.