Specifications include, but are not limited to: The City will arrange for the disconnection of utility service connections. Before starting demolition the contractor shall verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. The sewer shall be capped. Demolish and remove the house and foundation. All demolition materials shall be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. Remove concrete, bricks, limbs, branches and wood on ground, loose trash, debris and rubbish from the premises. Remove all interior sidewalks between the street and the back of the property. Remove the concrete garage pad adjacent to the alley.