Specifications include, but are not limited to:It is the intent to allow road closures as necessary to complete the work efficiently. Roads shall be closed to through traffic and open to local traffic only. Driveways shall remain open as long as possible and shall be restored with temporary access as soon as possible after pipe installation and pavement replacement has taken place. Emergency Services shall be notified of road closure prior to setting up traffic control. AC pavement replacement shall follow the details provided for pavement replacement & trench compaction under existing roads on sheet 13. The probes on the 4” polyethylene gas main show at Poplar the main is just clear under the proposed storm and the main at Green is in conflict by approximately two inches into the bottom of the proposed storm. Contractor to work with Kansas Gas representative Keaton Christner per the plan notes to lower the main in-place during construction. Materials to be used for geogrid reinforced base construction shall consist of virgin crushed stone, recycled Portland cement concrete, or a blend of recycled Portland cement concrete and Reclaimed Asphalt Pavement (RAP). This blend is not to exceed 50% RAP and shall be tested by use of an asphalt burn off oven to ensure compliance. All materials shall meet the following gradation specification.