Specifications include, but are not limited to: The Road & Bridge Division requires 30-60 miles of roadway be striped with yellow center line with no passing stripes where needed and white edge stripes creating a 12’ travel lane. Estimations of 1000-1300 gallons of yellow paint and 2000-3000 gallons of white paint will be needed to complete the project. Application of no less than 7 lbs. of glass beads per gallon of paint and no more than 8 lbs. of glass beads per gallon of paint is required. It is a requisite that your bid include the price per gallon of paint requirement and labor cost per gallon. Contractor is required to supply all materials. Paint and glass beads will need to meet or exceed Kansas specifications. Pavement markings shall conform to the applicable requirements of the 2009 Manual on Uniform Traffic Control Devices, Part III.