Specifications include, but are not limited to: A. Asphalt Overlay: 1. Remove existing loose granular and silt materials to stable surfaces. Contractor shall take possession of loose materials to legally dispose of off-site. 2. Full-depth patching NOT included with project base bid. 3. 2" minimum asphalt overlay, placed over existing concrete to existing curb or pavement joint as indicated. 4. Paint pavement markings. Chalk lines for Architect approval prior to painting. 5. Temporarily remove and replace existing wheel stops as coordinated with layout and secure with doweled installation. B. Provide hot-mix asphalt paving materials, workmanship, and other applicable requirements in accordance with KDOT standards and specifications.