Specifications include, but are not limited to: Provide all labor, materials, and equipment necessary to provide for the painting and necessary siding repairs required to four cabins located at Clinton State Park. This bid request is for all labor, equipment, and materials (excluding siding, paint and caulk) to completely repair or replace siding, clean, prime and paint four (4) cabins, decks, handrails and walkways located at Clinton State. Cabins are 32’ long, 16’ wide and 10’ tall. The 16’ sides have apexes, the decks are 6’ by 20’, the walkway is 6’ by 16’ and the handrails are 16’ long. Cabins are on concrete foundations. The cabins are on Coon Creek, Washington Creek, Elk Creek, and Wakarusa River. The existing deteriorating log siding will be replaced with owner provided board and all seams will be caulked (caulk also provided by owner). All four cabins, deck and walkways will be power washed and all previous stain/paint and paraffin wax removed. All four cabins, decks and walkways will be primed with two coats (paint provided by owner). All four cabins, decks and walkways will be painted with two coats (paint provided by owner). All work shall be completed within 30 calendar days of Notice to Proceed. Minimum disturbance of each site with regard to paint overspray will be required. Contractor shall cleanup and remove all litter, empty containers, debris, etc., from all work sites.