Specifications include, but are not limited to: This water main replacement project is to be constructed in an informal Design-Build Style. Baughman Engineering has been retained to provide design services and will coordinate with both the Contractor and City staff. The design engineer shall identify the right-of-way and property corners with baseline stationing, obtain primary ties for pipe alignment and elevation for the as-built, as well as elevations for valve boxes and fire hydrant bury lines; The contractor will be required to replace all sidewalks with concrete walk 4” thick and 3’ feet wide, that is disturbed by his operations even when the sidewalk is currently covered by vegetation or if the existing sidewalk is constructed of asphalt or gravel. There will not be any exceptions to this requirement..