Specifications include, but are not limited to: Provide all labor, materials, and equipment necessary to provide for the demolition of buildings and vault toilet at the Webster State Park. Buildings are located approximately 1 mile southeast of 8 Road and L Road on a minimum maintained road. Vault toilet is located in the park. Contractor shall meet the following requirements: A. Provide all equipment, operator(s), fuel, and other necessary items and expenses necessary to carry out work as specified. B. Demolish and haul all cinder block, footings and concrete to a designated location in the park to be used for rip rap. If rebar exists contractor will remove as much loose rebar as possible before hauling rip rap to the park. All other building material, building contents, and rebar must be hauled off and disposed of at contractor’s expense. C. After demolition and removal of materials, contractor will be responsible to bring in dirt and level area to existing grade of undisturbed ground in the area. D. All work will need to be done during dry conditions so road is not damaged when equipment is being hauled in or hauling debris off. If the road is damaged due to driving in wet conditions, the contractor will be responsible for repairs.