Specifications include, but are not limited to: • Review of the Design Documents and verification of the initial design intent with the Owner and Design Team. • Create and update a commissioning plan based upon the final design drawings. The 95% construction drawings are anticipated to be available on 12/3/2019. The plan shall include a commissioning outline to coordinate and direct the commissioning activities in a logical, sequential and efficient manner using consistent protocols and forms, centralized documentation and clear and regular communication and consultations with all necessary parties. • Create a commissioning specification to be included with the bidding documents. • Participation in one (1) commissioning kick-off meeting with the design team. • Participation in one (1) commissioning kick-off meeting with the contractor/subcontractors at the site prior to installation.