Specifications include, but are not limited to: 1. Furnish and install new Pump Station control panel as shown and specified. Panel shall provide process control for existing wastewater pumps. 2. Coordinate and install new Utility electric service connection. Contractor shall furnish associated electrical hardware, gear, and install per Utility requirements. 3. Furnish and install new standby generator and ancillary electrical as shown and specified. 4. Furnish and install new electrical equipment in existing below-grade Dry Well, as shown and specified. Equipment includes, but is not limited to: lighting, receptacles, switches, motor disconnects, etc. 5. Demolish existing electrical equipment as shown and specified