Specifications include, but are not limited to: The proposed project consists of construction of a new pump station and installation of a new pipeline located on properties between Maffitt Lake Road and Adams Street, west of Interstate 35 in West Des Moines, Iowa. The proposed pump station building will be a single-story, slab-on-grade structure with a preliminary finished floor elevation of 960 feet generating light to moderate structural loads; wall loads of less than 3 kips per lineal foot and column loads of less than 75 kips. Based on boring surface elevations, we anticipate minor cut-and-fill construction of 5 feet or less may be required to achieve the desired final grades near the pump station with possible excavations up to 15 feet deep or less for the proposed pipeline.