Specifications include, but are not limited to: Qualified contractors to provide electrical service repairs at Copper Creek Lake Park. 1. Panel 1 (see attached images) a. Remove and dispose of current electric panel b. Locate existing utilities c. City will be responsible for establishing/indicating the elevation of the grade change d. In align with the elevated grade changes, construct new footing that will be between 18 – 20 inches above grade and 36” below grade i. Footings must have a minimum of six (6) inch border to protect electrical panel e. Contractor will be responsible for coordinating any work with other utility companies (i.e. MidAmerican Energy) f. Install new electric panel with an identical distribution board and re-connect utilities 2. Panel 2 (see attached images) a. Remove and dispose of current electric panel b. Locate existing utilities c. Fabricate a mounting pedestal or enclosure that is designed to increase the height of the current electrical components 24” d. Install new electric panel with an identical distribution board and re-connect utilities e. City will be responsible for establishing/indicating the elevation of the grade change 3. Lighting Control Unit (see attached images) a. Remove, dispose and replace a lighting control unit located at the Community Sign at Copper Creek Lake Park b. Contractor will be responsible for evaluating and replacing if needed current LED fixtures c. Install new lighting control unit and re-connect utilities