Specifications include, but are not limited to: • Review and evaluation of the existing fire alarm systems at the main CCF Prison Complex, IPI Warehouse, CTC Training Center Building #1, and CTC Training Center Building #2. • Developing scope of work and design documents for the replacement of the fire alarm systems for the main CCF Prison Complex, IPI Warehouse, CTC Training Center Building #1, and CTC Training Center Building #2. • Design CTC Training Center Building #1 and #2 systems for compatibility to an existing JCI/Simplex System • Current CCF Prison and IPI Warehouse Building are JCI/Simplex system. The new fire alarm system to be installed shall be non-proprietary and open sourced. • Provide all design disciplines as necessary for the design of the complete fire alarm systems. Including fiber requirements, wiring, panels, cabinets, strobes, smokes, door magnets, flow switches, duct detectors, etc. to provide for a complete fire alarm system. • Design that shall allow for the existing system to remain active during construction. • Design that is compatible with existing building systems. • Design for scope of work, development of bidding documents (includes drawings and specification sections), development of construction budget, and construction administration with assigned construction manager (including responses to RFIs, review of submittals, approval of pay estimates, and regular on site quality checks).