Specifications include, but are not limited to: •Review and evaluation for replacement and possible relocation of two steam fired water heaters and associated mechanical piping at the Clarinda Correctional Facility Treatment Complex Boiler Plant. Existing water heaters are approximately 1,300 gallons each. •Currently one water heater is operational, and one has been removed from service. •RFP scope basis is for the replacement design of the one water heater that is currently removed from service. •Provide analysis of the operating water heater and provide information on life expectancy. Include the option of negotiating design for a second water heater if during the analysis of the existing system the operating water heater is required to be replaced.