Specifications include, but are not limited to: Protect existing underground utilities and fiber optic lines. Contractor shall verify the existence of and location of all utilities. Protect existing lighting and sidewalk. Contractor shall include preparation of top soil for seed and sowing of seed, fertilizer, mulch, and establishing of vegetative cover. This includes hauling, depositing, and spreading topsoil on any disturbed areas post site clearing. Control dust from spreading from all work and staging areas. Erosion control measures shall be provided and maintained throughout project to meet requirements of all regulatory agencies. Contractor shall match existing grade. Contractor shall repair and regrade any damage caused by construction activities.