Specifications include, but are not limited to: Cured-In-Place Pipe (CIPP) lining of approximately 12,823 linear feet of eight-inch (8”) diameter sanitary sewer, approximately 912 linear feet of ten-inch (10”) diameter sanitary sewer, approximately 1,958 linear feet of twelve-inch (12”) diameter sanitary sewer, and approximately 655 linear feet of fifteen-inch (15”) diameter sanitary sewer, 238 service reconnections and other miscellaneous associated work. Project also includes excavation and repair of one (1) sanitary sewer pipe at 22nd Street & Westown Parkway. Work includes 26 SY of sidewalk removal and replacement, 30 LF of curb wall removal and replacement, 10 LF of gabion stone wall removal and replacement, 10 SY of pavement removal and replacement, surface restoration and miscellaneous associated work.