Specifications include, but are not limited to: The project consists of work on the City of Crown Point's YMCA lift station and includes but is not limited to replacing the two submersible pumps in the wet well, wet well piping work to accommodate the new pumps, bypass pumping, providing and installing a new electrical meter base, Nema 4X fused disconnect switch, and new Nema 4X Duplex Submersible Pump Station Control/VFD Panel located outside adjacent to pump station. The new control panel consists of VFDs, submersible level control, interconnecting electrical wiring and conduit, incoming power supply, and all necessary hardware and programming to provide a complete and functioning system. As part of the project the contractor will be responsible for demolishing out the existing pump station control panel structure that consists of control panel, automatic transfer switch (to remain and be reused), breaker panel, receptacles, transformer, disconnect switch, meter base, and Omnisite panel (to remain and be reused).