Specifications include, but are not limited to: The project will involve constructing a 5-foot sidewalk on or along the north side of Jefferson Street, and construction of a 10-foot path along the south side of Jefferson Street. ADA curb ramps will be constructed. Amenities such as benches, bike racks, trash receptacles, and historical marker monuments will be placed along the trail. The historical markers will provide trail information and wayfinding information such as mile markers. The existing traffic signal at Drake Road will be replaced with decorative cantilever poles that will include lighting. These amenities will be designed to be consistent with others located throughout the City of Franklin, both existing and currently being installed. Marked crosswalks will be placed at Drake Road. Existing paths and sidewalks will be perpetuated throughout the project construction limits. There is an existing 5-foot sidewalk located throughout most of the project limits on the south side of Jefferson Street. Where the existing walk is in good shape, 10-foot path width will be achieved by adding a 5-foot panel of concrete adjacent to the existing. Elsewhere, the existing sidewalk will be removed and replaced with a 10-foot asphalt path. Generally, there is no sidewalk located on the north side of Jefferson Street. Where walk is presently located, it is in good condition and will be left in place.