Specifications include, but are not limited to: The selected firm will perform preliminary engineering and plan development services necessary to produce construction contract documents. The selected consultant shall complete an Engineering Assessment/Alternative Analysis for projects where one is not included in the RFP. Following INDOT's acceptance of the Engineering Assessment/Alternative Analysis, these contracts will be amended to include the following services: Environmental Document, Topographic Survey, Design & Plan Development, Permits Applications, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking), Geotechnical Engineering, Utility Coordination, Pavement Design and Construction Phase Services. Other services such as Level 1 Bridge Design, Ecological Surveys, Wetland Mitigation, Archaeological Investigations, Historical/Architectural Investigations may be included later if these work types become necessary.