Specifications include, but are not limited to: This work consists of removing a two-span bridge over Sheridan Creek and replacing with a single span bridge, roadway profile grade change, 0.1 miles of IL 96 resurfacing, new local access road, and drainage improvements. General work includes the construction of a single span bridge utilizing 6-66” web plate girders on semi-integral abutments, 32 feet wide face to face of parapets, 132 feet long back to back of abutments. Additional items include resurfacing existing hot-mix asphalt pavement, hot-mix asphalt shoulders, aggregate shoulders, concrete curb and/or gutter, riprap, guardrail, pavement marking, traffic control, seeding, and miscellaneous appurtenances as shown in the plans and as specified herein.