Specifications include, but are not limited to: A system to efficiently and seamlessly support relay protection testing for its electric infrastructure. The system should include the following: • The system shall be compatible with the Doble F6150 to perform end-to-end testing. • The hardware shall include a Global Positioning Satellite (GPS) interface, all required leads, connectors, jumpers, adapters, safety plugs, connection cables, and a carrying case. Optional: builtin touchscreen technology. • The software shall include a test plan library or automated test routines to perform simulated testing on various relays based on their function. Eight licenses will be required. • The labor for City staff to create new test plans for a new relay testing system should be minimal. • The proposed system should be intuitive and easy to learn/train.infrastructure.