Specifications include, but are not limited to: 1. Removal, handling and legal offsite disposal of all construction or demolition debris generated from all contract work, considering it to be clean construction or demolition debris (CCDD). 2. Removal, handling and legal offsite disposal of surplus soil generated from all contract work, considering it to be uncontaminated. 3. Debris and surplus soil disposal shall include any onsite drying of the material as required, so that the material will pass the paint-filter test as per Method 9095B in USEPA’s publication SW 846, prior to transportation. New stake mounted Medium Intensity Runway Lights - LED New stake mounted Medium Intensity Threshold Lights - LED New base mounted Medium Intensity Runway Lights - LED New stake mounted Medium Intensity Taxiway Lights - LED Removal of existing stake mounted lights Removal of existing base mounted lights New airfield signs (LED) New elevated retroreflective markers Removal of existing airfield signs and bases Removal of existing elevated retroreflective markers Spare Parts