Specifications include, but are not limited to:. The Village of Elk Grove Village will receive sealed bids for the Rotary Green Parking Lot Expansion, which improvements include demolition and removal of concrete sidewalk, concrete curbs and various underground piping along with earthwork, furnishing and installing storm sewer, concrete curb, aggregate base course, permeable paver pavement with MWRD volume control facility, hot-mix asphalt paving, lighting, pavement markings, decorative bollards and all incidental and collateral work necessary to complete the project within Village limits as shown on plans and as described in Specifications, Plans and Contract Document PW- 1920-17. The work required for this project also includes HMA pavement removal and resurfacing at three (3) separate public works sites within the Village as shown in the plans.