Specifications include, but are not limited to: Right-of-Way infrastructure improvements which includes the total roadway reconstruction of existing residential streets approximately 3325 feet in total length, removal and replacement of existing roadway pavement, concrete curb & gutter, sidewalk and driveway aprons. The project consists of the installation of 1282 tons of HMA Surface course, 2563 tons of HMA binder course, 6800 LF of concrete curb & gutter, 29100 sf of sidewalk, 1233 sy of concrete driveway apron, 4700 LF of 8” Ductile Iron Watermain, with associated fire hydrants, valves and vaults, 2730 LF of 1” domestic type “k” copper domestic water services with B-boxes, 4482 LF of 8” and 10” PVC SDR 26 sanitary sewers, 2741 LF of 6” PVC SDR sanitary service laterals with clean-out, 2416 LF of 12” and 15” RCP storm sewers with associated storm pickup structurers, lawn restoration and etc