Specifications include, but are not limited to: At Evelyn Alexander Elementary School, lower level renovation consisting of demolition and new Work to provide fire rated doors, frames and hardware, perimeter drain tile, sump pit, concrete floor slab cutting and repair, masonry wall revisions, mechanical revisions, light replacement and restoration of finishes in five (5) rooms. 2. At Green Bay Early Childhood Center, washroom renovations consisting of demolition and new Work to provide; ADA accessibility, fixture replacement, piping revisions, mechanical revisions, doors, frames, hardware, toilet partitions, LED light fixtures, ceramic wall tile, FRP paneling, sheet vinyl flooring, lay-in ceiling system and new finishes within two (2) sets of boys' and girls' washrooms, two (2) staff washrooms and one (1) laundry room