Specifications include, but are not limited to: The Contractor will furnish, deliver, and supply F.O.B., to the City of Chicago, Department of Aviation (CDA), all supervision, labor, material, equipment, transportation of equipment and materials, tools, traffic control, barricades, safety equipment, locating of utilities, and applicable permits necessary to perform Landside Concrete Maintenance and Repair, including excavation, partial and full-depth removal and replacement of Portland Cement Concrete (PCC) pavements, structures, and related appurtenance items. The scope of Work may include, but is not limited to, roadways, sidewalks, curb and gutter, structural concrete, foundations, etc., where directed by the Commissioner at Chicago O'Hare (O’Hare) and Midway (Midway) International Airports.