Specifications include, but are not limited to: 1) Doors, frames, and other hardware including closers, hinges, and alarms shall be removed. All shall be properly re-installed, with exception of frames. 2) New galvanized and primed frames shall be ordered; new frames shall be painted by Facility Painters prior to installing. 3) Current doors shall be re-hung after new frames have arrived and been painted by Facility Painters, ensuring below requirements are completed. 4) New galvanized doors (2) and frames (2) shall be purchased and installed for Buildings C3 and D46. 5) All doors and frames shall be prepared for installation of door alarm; frames shall be insulated prior to installing 6) Existing Interlogix model 1078C-N door alarm hardware shall be reinstalled; two (2) new alarm units of same model or equivalent shall be ordered new for C3 and D46 doors. 7) Door alarm wiring shall be installed in frame. 8) Frames shall be insulated, plumb, anchored to floor, and securely anchored to opening using proper fasteners and appropriate door clips or other fastening hardware. 9) Frames shall be caulked using urethane caulk.