Specifications include, but are not limited to: 1. Meet with City staff and City’s engineering consultant to discuss and finalize project objectives. Review existing geotechnical and sieve analysis data and identify the work plan and schedule.2. Furnishing all labor, materials, and equipment necessary to install a test well on the City’s property located immediately north of the water treatment plant on the east side of IL Route 164 approximately 1 mile south of Oquawka, Illinois. 3. The test well work will consist of drilling and developing the well, installing screens, installing gravel pack, installing casing pipe, grouting and sealing as necessary to protect the wateraquifer below ground, yield and pump testing, providing a well driller log and related well construction data, obtaining water samples representative of the aquifer and providing them to the City’s consultant for obtaining water quality analysis, and sealing the test well off to prevent future contamination. The City is desiring to ultimately use this information to construct a new public water supply well capable of producing 2,000 – 3,000 GPM.