Specifications include, but are not limited to:. The project shall consist of demolition and installation of: pumps, pump controls, SCADA, electrical gear, VFDs, and generator, along with coating of the wet well, valve vault, and piping. The Contractor shall be responsible for controlling and maintaining all sanitary flows within the sewer system and lift station during the length of the project. The Contractor is responsible for removal and protection of all equipment and associated appurtenances inside the wet well prior to the preparation and coating work. The equipment and appurtenances must be reinstalled once the coating has cured. After reinstallation, the equipment will be tested in the presence of the Owner and Engineer to make sure it is functioning properly.