Specifications include, but are not limited to: develop a comprehensive facilities condition assessment of our inventory of buildings, sites and exterior facilities. This scope will include integration with a building management system. 5.2.1. Information consolidation – Method of collection and reporting. 5.2.2. Identifying current facility condition and deficiencies. 5.2.3. Recommending corrections for all deficiencies. 5.2.4. Providing cost estimates for corrections. 5.2.5. Forecasting future facility renewal costs. 5.2.6. Incorporating pre-existing FCA data Decennial Life Safety survey District life cycle information 5.2.1. Information consolidation – Method of collection and reporting. 5.2.2. Identifying current facility condition and deficiencies. 5.2.3. Recommending corrections for all deficiencies. 5.2.4. Providing cost estimates for corrections. 5.2.5. Forecasting future facility renewal costs. 5.2.6. Incorporating pre-existing FCA data Decennial Life Safety survey District life cycle information 5.2.7. Consultant will meet with RPS to identify all reliable sources of existing study materials for information such as building lists, plans, maps, studies, inventories, naming conventions and capital requests. In order to produce accurate data and to ensure consistent, up-to-date reports, RPS will provide any past studies, current bids for work or detailed evaluation reports such as: 2012 Facilities Master Plan. Building drawings: mechanical, electrical, architectural, and structural.