Specifications include, but are not limited to:. The project work includes renovation of approximately 5,000 sf of classroom and corridor space on the lower level of the Education Building into collaboratory spaces consisting of collaborative classrooms, collaborative meeting spaces, offices and a media communications lab/video recording studio. All project areas are to have hazardous materials abated. Corridor C5 and Room 3 will be abated by other prior to start of construction. All remaining project areas will be abated by the contractor. The scope will include, at minimum, renovation of existing interior spaces including walls, doors, and finishes; new work consisting of modifying existing hollow metal frames, glazing, metal stud and gypsum board soffits, acoustical wall panels, glass marker boards, flooring, suspended acoustical ceiling tile and grid, sunshades and painting; and all associated Plumbing, Mechanical, Electrical and AV work. The existing building MEP systems will be reconfigured to serve the remodeled areas