Specifications include, but are not limited to: 1.Review proposed project scope as compared to project budget to determine if the scope of work for both design, permits, and construction and construction engineering can be achieved within, or close to, the budget amount of $515,000. 2.Coordinate and attend project kickoff meeting with Village of Oak Park Engineering Division to review project design, details, standards, and develop understanding of the project. 3.Review project sites for compliance with Village’s complete streets policy and submit Complete Streets Checklist for each project site at time of pre-final plans. 4.Provide any topographic surveys needed for ADA improvements. 5.Prepare detailed plans and specifications meeting IDOT and Oak Park requirements, including traffic control plans for lane closures on I-290. 6.Provide bridge deck inspections for Home, East, and Lombard Avenue Bridges by sounding the decks and using GPR. GPR data shall be correlated with results from top-side and bottom-side visual inspections and sounding of the deck.