Specifications include, but are not limited to: Demolition: Demolition of the existing Pumps No. 2 and No. 3, including: pump, motors, VFD’s, piping, concrete pedestals, and electrical conductors for each. See Contract Drawings for salvage requirements for the removed equipment. Structural: Installation of new pump/motor support frame and associated piping. Process Piping and Equipment: Installation of new pumps. Construction of new intake and discharge piping to the new pumps. Connections shall be made to existing piping at locations as shown on the Contract Drawings. Prior to construction of new process piping, the Contract shall remove all debris from the existing pump suction lines that extend into the wet well. See Contract Drawing 30-M-1 for cleaning requirements.