Specifications include, but are not limited to: he Work includes the rehabilitation of two multi-leg elevated water storage tanks. The Campbell Street Tank shall be rehabilitated in 2020 and the Central Road Tank shall be rehabilitated in 2021. Campbell Street Tank work includes full blast and recoat of tank interior, high pressure coat and partial blast and overcoat of tank exterior; replacing the cathodic protection system; replacing ladder fall protection systems; replacing the roof vent, manway, and FAA obstruction light; rehabilitating a number of leg foundations; and other miscellaneous repairs. Central Road Tank work includes full blast and recoat of tank interior, high pressure coat and partial blast and overcoat of tank exterior with containment shroud, replacing ladder fall protection systems, replacing the roof manway and FAA obstruction light, minor asphalt and concrete work to construct some parking bays on an existing driveway, and other miscellaneous repairs.