Specifications include, but are not limited to: This project consists of bridge beam replacement, substructure repairs and any collateral or incidental work necessary to complete the project as shown on the plans and described herein. Pay Item # UOM Description Type Quantity Unit Price X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 831.000 X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000 X7011015 L SUM TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) Base items 1.000 X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 2,239.000 Z0001903 POUND STRUCTURAL STEEL REMOVAL Base items 29,110.000 Z0001905 POUND STRUCTURAL STEEL REPAIR Base items 600.000 Z0003600 L SUM BEAM STRAIGHTENING Base items 1.000 Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 51.400 Z0073300 L SUM TEMPORARY SHORING AND CRIBBING Base items 1.000