Specifications include, but are not limited to: The Contractor will furnish, deliver, and supply F.O.B., to the City of Chicago, Department of Aviation (CDA), all supervision, labor, material, equipment, transportation of equipment and materials, tools, traffic control, barricades, safety equipment, locating of utilities, and applicable permits necessary to perform Airside Concrete Maintenance and Repair (Work) under one-hundred (100) contiguous cubic yards at Chicago O’Hare and Midway International Airports (individually, the "Airport" or “O’Hare” and/or “Midway”, and collectively the "Airports"); excavation with or without bituminous and PCC removal or PCC installation, partial and full-depth removal of Bituminous and PCC pavements, and installation of Portland Cement Concrete (PCC), patching mortars, pavements, structures, and related appurtenance items. All line items in this Contract may be utilized with or without bituminous/PCC removal and/or installation; all in accordance with the General Conditions, Special Conditions, and Detailed Specifications of this Contract.