Specifications include, but are not limited to: A. The work includes all labor, equipment, materials, and supplies necessary to perform the scope of work in the documents by the procedures described herein. The contractor, by submitting a bid for the work, represents itself as knowledgeable and expert in the performance of the work, and includes all things usually and customarily necessary to provide a complete and finished job, whether specifically mentioned or not. Related work may be shown in other related documents, prepared by others, if applicable. B. Removal of friable and non-friable asbestos-containing materials listed in the documents, including isolating the work areas, protection of adjacent areas, cleanup, proper packaging and disposal of wastes, and all other steps necessary to complete the scope of work. C. Repair or replacement of damaged surfaces, fixtures, or furnishings in portions of the structure that will not be demolished, if any, to restore them to their pre-existing condition to the satisfaction of RPS205. D. Compliance with all applicable laws, regulations, standards, and these specifications. In the case of a conflict, the contractor will comply with the most stringent. E. All licenses, accreditations, permits, fees, notifications, reports, or other documents required by law, regulation, this specification, or the Document