Specifications include, but are not limited to: Interior renovations to existing 911 Dispatch area with associated mechanical and electrical work. A. Work under this Contract includes: 1. Interior Finishes a. Insulated gypsum board/metal stud partitions. b. Floor finishes of VCT, and access flooring. c. Wall finishes of paint. d. Ceiling finishes of acoustical lay-in tile, and gypsum board soffits. e. Plastic laminate casework, HM doors and frames, wood doors, hardware, glazing, and miscellaneous specialties. 2. Mechanical Systems a. Ventilation to include ductwork and duct insulation modifications. b. Supplemental cooling to include new CRAC unit. 3. Electrical Systems a. Distribution panels, conduit and wiring. b. Interior Lighting. c. Fire alarm and security system extensions. 4. Keep Architect fully informed about progress of the work, performance of the work and potential problems.